COST ESTIMATE OF UPPER STRUCTURE AT THE MANOR OFFICE TOWER PROJECT

Neneng, Rahtu Sumantri and Martalius, Peli and Vivi, Ariani (2017) COST ESTIMATE OF UPPER STRUCTURE AT THE MANOR OFFICE TOWER PROJECT. Diploma thesis, Universitas Bung Hatta.

[img] Text
23. COVER.pdf

Download (462kB)
[img] Text
23. ISI.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

This paper aims to be able to analyze the construction work on The Manor Office Tower.The Manor Office Tower Project is located on Jl. Surya Utama Kav C1, Suryacipta Ciampel Industrial Area, Karawang, West Java. The Manor Office Tower consists of 8 floors and 2 roofs with a building area of ± 11,264 m². Projects with contracts of Rp 67,643,871,638.- with preliminary work, structural work, architectural work, mechanical and electrical work, and occupational drainage work for 23 calendar months. The calculation results of the upper structure estimate covering the work of columns, beams, slabs, shear walls and stairs project cost The Manor Office Tower Rp 25.075.088.244.- using the Work Unit Price Analysis of Indonesian National Standard in 2013. Total cost includes VAT10%. For each of structure work are column is Rp 4,047,153,118, shear wall is Rp 1.865.887.451, beam is Rp 6,055,758,220, slab is Rp 10.258.030.308 and stair is Rp 568.705.671.Based on the time schedule of the structural work of The Manor Office Tower Project. Which made the top structural work completed for 46 weeks. Advances received at the beginning of the project amounted to 10% of the project value. To achieve the target of construction project in accordance with the schedule, then in the construction project should pay attention to quality control items, among others: material schedule, man power schedule and time and wage work. These three components play a role in the preparation of BOQ, one and the other are related and if one experiences delays or increases in cost.It is almost certain that it will directly affect other items, and ultimately result in delays and increases in the total cost of construction projects. Keywords: Bill Of Quantity, Cost Analysis, Time Schedule, S Curve, Cash Flow, The Manor Office Tower

Item Type: Thesis (Diploma)
Subjects: T Technology > TH Building construction
Divisions: Fakultas Teknik Sipil dan Perencanaan > Teknik Ekonomi Konstruksi
Depositing User: Erlya Wahyuni
Date Deposited: 11 Aug 2023 03:27
Last Modified: 11 Aug 2023 03:27
URI: http://repo.bunghatta.ac.id/id/eprint/14541

Actions (login required)

View Item View Item