Martha, Nabila Apsari and Jumas, Dwifitra Y (2024) Analysis Of The Calculation Of Architectural Work Cost At Fairfiled Airport Hotel Tangerang. Diploma thesis, Universitas Bung Hatta.
Text
I. COVER, LEMBAR PENGESAHAN, ABSTRAK, DAFTAR ISI dan BAB PENDAHULUAN.pdf Download (2MB) |
|
Text
II. BAB KESIMPULAN DAN SARAN.pdf Download (559kB) |
|
Text
III. FULLTEXT TUGAS AKHIR.pdf Restricted to Repository staff only Download (24MB) |
Abstract
The Final Project is one of the graduation requirements for the Diploma 3 Quantity Surveying Departments, Bung Hatta University. This Final Project discusses about Fairfield Airport Hotel. The Fairfield Hotel Airport Building Project is a hotel building project which has a number of floors (ground to upper) 10 floors + roof floors + basement floors with a building floor area of 13,506 M2 with a project value of Rp 72,248,000,000.00 The calculations and analyses carried out include the calculation of the bill of quantity using the cost budget plan calculation method, time schedule, and the preparation of cash flow. In the calculation of Bill Of Quantity, the list of wages and materials in the Banten region in 2023 is used. The results of the detailed calculation of the estimate obtained the cost of physical construction for architectural work, namely wall work, façade, floor, ceiling, doors and windows, sanitary, finishing, and lighting without VAT of Rp. 38.083.602.332,07 (without VAT) if the addition of VAT by 11% becomes Rp. 42.272.789.588,60 (including VAT). Based on the calculation of the estimate, a time schedule is prepared in the form of an S curve and cashflow. The schedule for the implementation of work on the Fairfield Hotel Airport project is 14 months, with a monthly payment system. From the analysis of the cash flow plan, it is concluded that the monthly payment system during the implementation time is 10% down payment and 5% retention (12 months maintenance period).
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > TH Building construction |
Divisions: | Fakultas Teknik Sipil dan Perencanaan > Teknik Ekonomi Konstruksi |
Depositing User: | QS FTSP |
Date Deposited: | 02 Sep 2024 02:00 |
Last Modified: | 02 Sep 2024 02:00 |
URI: | http://repo.bunghatta.ac.id/id/eprint/21309 |
Actions (login required)
View Item |