Yuin, Esa Saputra and Yusrizal, Bakar and Noviyarsi, Noviyarsi (2015) TINJAUAN KELAYAKAN INDUSTRI PENGOLAHAN LUMP MENJADI BLANKET BERKAPASITAS SKALA KECIL DIKABUPATEN KEPULAUAN MERANTI. Diploma thesis, UNIVERSITAS BUNG HATTA.
|
Text
COVER- BAB I.pdf Download (1MB) | Preview |
|
Text
FULL TEKS.pdf Restricted to Repository staff only Download (2MB) |
Abstract
The research about review the feasibility of manufacturing industry into lump became blanket small capacity at kabupaten kepulauan meranti. In this research the need for a financial analysis of the worth or not the establishment of a processing plan lump became blanket small capacity can be implemented easily by the farming communities. Data processing includes project requests, cost calculation, calculation net present value, discounted payback period, internal rate of return. Result show the parameter values Net Present Value (NPV) with interest rates 11.5% as big as 1,469,457,031 (a feasible plan if NPV ≥ 0). Discounted Pay Back Period for 4 years (in the fourth years) with a net value at the time of Rp 281,952,692. Limit the ability of cashflow or Internal Rate of Return (IRR) for a description of cashflow in on interest rates 36.74%. Based on the analysis and the discussion showed that the development plan processing plant lump became blanket with capacity 2 ton/day it is feasible. keyword : The level of interest and customer satisfaction, the rate gap between expectations, perceptions of service, quality of service
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Fakultas Teknologi Industri > Teknik Industri |
Depositing User: | Heltree Ivatureza |
Date Deposited: | 11 Dec 2024 08:29 |
Last Modified: | 11 Dec 2024 08:29 |
URI: | http://repo.bunghatta.ac.id/id/eprint/23795 |
Actions (login required)
View Item |