Items where Author is "INDRA, KHAIDIR"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 14.

Thesis

Dia, Meta Pratama and INDRA, KHAIDIR (2023) PERENCANAAN SUMUR RESAPAN UNTUK PENGENDALIAN BANJIR PADA KAMPUS III UIN IMAM BONJOL KOTA PADANG. Diploma thesis, Uinversitas Bung Hatta.

Utari, Febriharyu and INDRA, KHAIDIR (2023) PERENCANAAN SUMUR RESAPAN UNTUK PENGENDALIAN BANJIR PADA POLTEKKES KEMENKES PADANG. Diploma thesis, Universitas Bung Hatta.

INDRA, KHAIDIR and Rita, Anggraini and Juita, Herfina (2023) PERENCANAAN PENJADWALAN WAKTU MENGGUNAKAN METODE PDM (PRECEDENCE DIAGRAM METHOD) Studi Kasus : Pembangunan Rumah Sakit Umum Daerah (RSUD) Rasidin Padang. Other thesis, UNIVERSITAS BUNG HATTA.

yusuful khoir, yusuf and Eva, Rita and INDRA, KHAIDIR (2022) ANALISIS KERUSAKAN PERMUKAAN JALAN MENGGUNAKAN METODE PCI DAN METODE IRI STUDI KASUS JALAN NASIONAL SURIAN-PADANG ARO (STA 100+00-105+000). Diploma thesis, Universitas Bung Hatta.

Reynaldi, Ferdiansyah and Afrizal, Naumar and INDRA, KHAIDIR (2021) ANALISA KAPASITAS BANGUNAN JARINGAN IRIGASI PADA DAERAH IRIGASI BATANG ASAI (RUAS JARINGAN PADA SALURAN KIRI PRIMER BBA 0 – BBA 7 – SALURAN SEKUNDER BLD 1 - BB6). Diploma thesis, Universitas Bunghatta.

Edi, Haryanto and Eva, Rita and INDRA, KHAIDIR (2021) ANALISIS KINERJA LALU LINTAS DAN TINGKAT PELAYANAN JALAN DI RUAS JALAN KOTA (STUDI KASUS JALAN M. YUNUS, KOTA PADANG). Diploma thesis, Universitas Bung Hatta.

RANDI, SAPUTRA and INDRA, FARNI and INDRA, KHAIDIR (2020) ANALISA PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (lembur) MENGGUNAKAN METODE TIME COST TRADE OFF. Diploma thesis, Universitas Bung Hatta.

Mathlail, Fajri and RAHMAT and INDRA, KHAIDIR (2020) PENERAPAN APLIKASI MICROSOFT PROJECT DALAM PERENCANAAN PENJADWALAN PROYEK PEMBANGUNAN GEDUNG LABORATORIUM STIFARM PADANG. Diploma thesis, Universitas Bung Hatta.

DAVID, HARIADI and TAUFIK, TAUFIK and INDRA, KHAIDIR (2020) PENGARUH PENGGUNAAN LIMBAH PECAHAN GENTENG BETON SEBAGAI PENGGANTI AGREGAT KASAR CAMPURAN BETON MUTU f’c 25 mpa. Diploma thesis, Universitas Bung Hatta.

Muhammad, Rizki Maulana and BAHRUL, ANIF and INDRA, KHAIDIR (2020) PENGARUH PENGGUNAAN LIMBAH BETON SEBAGAI PENGGANTI AGREGAT KASAR TERHADAP KUAT TEKAN BETON MEMADAT SENDIRI (SELF COMPACTING CONCRETE). Diploma thesis, Universitas Bung Hatta.

Anggi, Pranata and LUSI, UTAMA and INDRA, KHAIDIR (2020) PERENCANAAN BENDUNG BATANG TITIK AMPERA, KECAMATAN AKABILURU, KABUPATEN 50 (LIMA PULUH) KOTA. Diploma thesis, Universitas Bung Hatta.

Nabilah, Fatimah and Afrizal, Naumar and INDRA, KHAIDIR (2020) PERENCANAAN BENDUNG TALANG KUNING DIKOTA PARIAMAN. Diploma thesis, Universitas Bung Hatta.

Rosmalia, Rosmalia and WARDI, WARDI and INDRA, KHAIDIR (2020) PERENCANAAN PENERAPAN METODE KONSEP NILAI HASIL (EARNED VALUE CONCEPT) PADA PEMBANGUNAN PROYEK RSUD.DR.RASIDIN PADANG. Diploma thesis, Universitas Bung Hatta.

Findra, Hidayat and INDRA, KHAIDIR and Embun, Sari Ayu (2020) PERENCANAAN PENJADWALAN PROYEK DENGAN MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM) (STUDI KASUS: PERENCANAAN PEMBANGUNAN/REHABILISASI SARANA DAN PRASARANA UPTD BPTPH (DAK) KOTA PADANG. Diploma thesis, Universitas Bung Hatta.

This list was generated on Wed Apr 17 04:34:45 2024 WIB.