Budi Irwan Asri, Irwan Asri and Wahyudi, P. Utama and Martalius, Peli (2024) ANALISIS FAKTOR YANG MEMPENGARUHI KEBERHASILAN KERJASAMA KONTRAKTOR DENGAN PEMASOK READY MIX PEMBANGUNAN PSU JALAN PENGHUBUNG PADA PERUMAHAN SKALA BESAR KOTA JAMBI. Masters thesis, Universitas Bung Hatta.
Text
Budi Irwan Asri .pdf Restricted to Repository staff only Download (2MB) |
|
Text
Budi Irwan Asri -1-20.pdf Download (379kB) |
|
Text
Budi Irwan Asri -108-110.pdf Download (36kB) |
Item Type: | Thesis (Masters) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Program Pascasarjana > Magister Teknik Sipil |
Depositing User: | Teknik Sipil Magister |
Date Deposited: | 13 Sep 2024 07:17 |
Last Modified: | 13 Sep 2024 07:17 |
URI: | http://repo.bunghatta.ac.id/id/eprint/23003 |
Actions (login required)
View Item |