Mathlail, Fajri and RAHMAT, and INDRA, KHAIDIR (2020) PENERAPAN APLIKASI MICROSOFT PROJECT DALAM PERENCANAAN PENJADWALAN PROYEK PEMBANGUNAN GEDUNG LABORATORIUM STIFARM PADANG. Diploma thesis, Universitas Bung Hatta.
Other
17 MATHALAIL FAJRI 1110015211015 COVER.PDF Download (31kB) |
|
Text
17 MATHALAIL FAJRI 1110015211015 ABSTRAK.pdf Download (207kB) |
|
Other
17 MATHALAIL FAJRI 1110015211015 BAB 1.PDF Download (118kB) |
|
Other
17 MATHALAIL FAJRI 1110015211015 BAB II.PDF Restricted to Repository staff only Download (276kB) |
|
Other
17 MATHALAIL FAJRI 1110015211015 BAB III.PDF Restricted to Repository staff only Download (1MB) |
|
Other
17 MATHALAIL FAJRI 1110015211015 BAB IV.PDF Restricted to Repository staff only Download (2MB) |
|
Other
17 MATHALAIL FAJRI 1110015211015 BAB V.PDF Restricted to Repository staff only Download (117kB) |
|
Other
17 MATHALAIL FAJRI 1110015211015 DAFTAR PUSTAKA.PDF Download (82kB) |
Abstract
PENERAPAN APLIKASI MICROSOFT PROJECT DALAM PERENCANAAN PENJADWALAN PROYEK PEMBANGUNAN GEDUNG LABORATORIUM STIFARM PADANG Mathlail Fajri, Rahmat, Indra Khaidir Jurusan Teknik Sipil, Fakultas Teknik Sipil Dan Perencanaan, Universitas Bung Hatta Padang Email :adamfajri08@gmail.com, r4mt_99@yahoo.com, ghaniaindra@yahoo.com Abstrak Pada saat ini perkembangan pembangunan konstruksi gedung di indonesia terus berkembang. , maka tingkat kesulitan untuk mengelola dan menjalankan sebuah proyek konstruksi semakin tinggi. Semakin tinggi tingkat kesulitannya, berarti semakin panjang durasi waktu yang dibutuhkan untuk menyelesaikan proyek tersebut. Oleh karena itu disini dibutuhkan majemen yang baik untuk mengendalikan sebuah proyek konstruksi, demi mencapai sebuah efisiensi dan efektifitas pengelolaan proyek, sehingga dapat dicapai hasil proses pengendalian biaya (cost), mutu (quality), dan waktu (time) yang menepati perencanaan. Pada umumnya suatu proyek yang dikerjakan akan selalu memiliki resiko yang tinggi. Resiko yang tinggi tersebutlah yang dijadikan dasar mengapa suatu perencanaan jadwal dan pelaksanaan dalam penyelesaiaan pekerjaan pada suatu pekerjaan proyek harus dilakukan secara tepat dan hati-hati. Selain itu suatu proyek juga akan terbatas atau dibatasi oleh biaya dan waktu yang digunakan dalam penyelesaian pekerjaan. Dalam arti , tepat waktu, mutu, serta mempunyai tiga karasteriktik yang dapat di pandang secara tiga dimensi, Berdasarkan hasil dari pencarian data melalui Microsoft project 2016 didapatkan waktu sebanyak 264 hari sedangkan dari data perencanaan 365 hari kerja. jadi dalam pekerjaan tersebut sudah efektif dan efisien. Kata Kunci : Microsoft Project, Efisiensi, Efektifitas APPLICATION OF MICROSOFT PROJECT IN PLANNING OF SCHEDULING DEVELOPMENT PROJECT STIFARM LABORATORY BUILDING PADANG Mathlail Fajri, Rahmat, Indra Khaidir Department of Civil Engineering, Faculty of Civil Engineering and Planning, Bung Hatta University, Padang Email :adamfajri08@gmail.com, r4mt_99@yahoo.com, ghaniaindra@yahoo.com Abstrak At this time the development of building construction in Indonesia continues to grow. , the level of difficulty to manage and run a construction project is higher. The higher the level of difficulty, means the longer duration of time needed to complete the project. Therefore, good management is needed to control a construction project, in order to achieve an efficiency and effectiveness of project management, so that the results of the cost control, quality, and time can be fulfilled planning. In general, a project undertaken will always have a high risk. This high risk is the basis of why a schedule planning and implementation in the completion of work on a project work must be done properly and carefully. In addition, a project will also be limited or limited by the cost and time spent in completing work. In a sense, on time, quality, as well as having three characteristics that can be viewed in three dimensions, Based on the results of data search through Microsoft Project 2016, 264 days were obtained while from planning data 365 working days. so the work is already effective and efficient Key Words :Microsoft Project, Efficiency, Effectiveness
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik Sipil dan Perencanaan > Teknik Sipil |
Depositing User: | Sri Erlita |
Date Deposited: | 07 Jul 2020 07:19 |
Last Modified: | 07 Jul 2020 07:19 |
URI: | http://repo.bunghatta.ac.id/id/eprint/253 |