ANALISA PERHITUNGAN BIAYA PEKERJAAN STUKRUR PADA PROYEK GEDUNG 2 ADMINISTRASI DAN PERKULIAHAAN UNIVERSITAS PEMBANGUNAN JAYA

Randa, Randa and Dwifitra, Y. Jumas and Zulherman, Zulherman (2020) ANALISA PERHITUNGAN BIAYA PEKERJAAN STUKRUR PADA PROYEK GEDUNG 2 ADMINISTRASI DAN PERKULIAHAAN UNIVERSITAS PEMBANGUNAN JAYA. Diploma thesis, UNIVERSITAS BUNG HATTA.

[img] Text
33 RANDA (1610015410037) COVER.pdf

Download (10kB)
[img] Text
33 RANDA (1610015410037) ABSTRAK.pdf

Download (5kB)
[img] Text
33 RANDA (1610015410037) BAB I.pdf

Download (120kB)
[img] Text
33 RANDA (1610015410037) BAB II.pdf
Restricted to Repository staff only

Download (178kB)
[img] Text
33 RANDA (1610015410037) BAB III.pdf
Restricted to Repository staff only

Download (524kB)
[img] Text
33 RANDA (1610015410037) BAB IV.pdf
Restricted to Repository staff only

Download (221kB)

Abstract

Proyek Gedung 2 Administrasi dan Perkuliahaan Universitas Pembangunan Jaya disusun time schedule dalam bentuk kurva S dan cashflow. Jadwal pelaksanaan pada proyek Gedung 2 Administrasi dan Perkuliahaan Universitas Pembangunan Jaya untuk lingkup pekerjaan struktur atas selama 7 bulan, dengan sistem bayaran bulanan (monthly certificate) sebanyak 7 kali pembayaran. Dari analisa perencanaan cashflow dapat disimpulkan bahwa dengan sistem pembayaran bulanan selama 7 bulan waktu pelaksanaan dengan uang muka 10% yaitu Rp 1.357.798.864,00 dan retensi 5% yaitu Rp 678.899.432,00 dan pinjaman kas kantor sebesar Rp. 1.705.000.000,00 Kata Kunci: Detail Estimasi, Time Schedule, Cash flow dan Gedung 2 Administrasi dan Perkuliahaan Universitas Pembangunan Jaya .

Item Type: Thesis (Diploma)
Subjects: T Technology > TH Building construction
Divisions: Fakultas Teknik Sipil dan Perencanaan > Teknik Ekonomi Konstruksi
Depositing User: Hermanto Hermanto
Date Deposited: 20 Jul 2020 07:03
Last Modified: 20 Jul 2020 07:03
URI: http://repo.bunghatta.ac.id/id/eprint/459

Actions (login required)

View Item View Item