Feasibility Study of Hydropower Plant at Lubuak Gadang Sangir South Solok

Hidayat, Dayat and Azriyenni Azhari Zakri, Yenni and Iman Satria, Iman (2021) Feasibility Study of Hydropower Plant at Lubuak Gadang Sangir South Solok. Feasibility Study of Hydropower Plant at Lubuak Gadang Sangir South Solok, 4 (1). pp. 121-126. ISSN 2654-4644

[img] Text
Jurnal 1 IJEEPSE Reposi.pdf - Published Version

Download (7MB)

Abstract

The feasibility study is one of the principal documents in building a hydropower plant consisting of technical, economic, and financial aspects. Contained technical studies on civil, mechanical, and electrical. This requires data on hydrologic, geology, land contours, river discharge, water catchment areas, and so on. Economic and financial studies include cost and financial parameters such as; BEP, IRR, NVP, BCR, and others. The installed capacity of a hydropower plant is given in optimization based on the Flow Duration Curve (FDC) and the Capacity Factor (CF) used the Newton Interpolation Method. The results showed that the installed power capacity was 11.99 MW. The water discharge was 31.603 m3/secs and the effective head was 37.5 meters. Annual income is around IDR 103.026 billion. Finally, HPP Lubuak Gadang is technically, economically, and financially feasible, so it is feasible to carry out the next process.

Item Type: Article
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknologi Industri > Teknik Elektro
Depositing User: Hidayat UBH
Date Deposited: 28 Dec 2021 08:33
Last Modified: 28 Dec 2021 08:33
URI: http://repo.bunghatta.ac.id/id/eprint/7000

Actions (login required)

View Item View Item