KASANG 1 WEIR’S RE-PLANNING ANALYSIS PADANG PARIAMAN DISTRICT

Wisdom, Zain and Zahrul, Umar and Zuherna, Mizwar (2020) KASANG 1 WEIR’S RE-PLANNING ANALYSIS PADANG PARIAMAN DISTRICT. Diploma thesis, UNIVERSITAS BUNG HATTA.

[img] Text
45 Wisdom Zain 1310015211064 Cover.pdf

Download (275kB)
[img] Text
45 Wisdom Zain 1310015211064 Abstrak.pdf

Download (106kB)
[img] Text
45 Wisdom Zain 1310015211064 BAB I.pdf

Download (208kB)
[img] Text
45 Wisdom Zain 1310015211064 BAB II.pdf
Restricted to Repository staff only

Download (756kB)
[img] Text
45 Wisdom Zain 1310015211064 BAB III.pdf
Restricted to Repository staff only

Download (89kB)
[img] Text
45 Wisdom Zain 1310015211064 BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
45 Wisdom Zain 1310015211064 BAB V.pdf
Restricted to Repository staff only

Download (42kB)
[img] Text
45 Wisdom Zain 1310015211064 Daftar Pustaka.pdf

Download (81kB)

Abstract

Kasang 1 Weir is located in Nagari Kasang, Batang Anai District, Padang Pariaman Regency, West Sumatra Province. Now adays, the weir has been broke by age and has damaged the body of the weir and the olak pond. It causes the damage to the weir, the water in the Batang Kasang river does not flow into the irrigation channel. In this final project planning, several calculations are carried out such as hydrological analysis, hydraulic calculation of weirs, and weir stability. Supporting data are in the form of 1: 50,000 scale topographic maps and 10-year rainfall from 2008-2017. Hydrological analysis calculations, calculating the average rainfall using the Thiessen method. From the calculation, the cathment area is 3.24 km² wide, the flood discharge plan is 93.65 m³ / s, the effective width of the weir is 23.2 m, using a round type lighthouse with of 1.2 m on high. In the stabilty’s calculation of the weir during normal water conditions, the safety figure against bolster is about 2.97 and sliding is about 4.24. When the water time is flooded are obtained the safety figures for bolster is about 2.29 and sliding is about 2.82. The water voltage in a normal condition 1.792 t / m² and during flood water obtained 0.829 t / m². Then a stable weir condition is obtained. Keywords : Weir, Lighthouse, Flood Discharge, Effective Width, Stabilty’s

Item Type: Thesis (Diploma)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik Sipil dan Perencanaan > Teknik Sipil
Depositing User: Heltree Ivatureza
Date Deposited: 07 Dec 2020 04:02
Last Modified: 07 Dec 2020 04:02
URI: http://repo.bunghatta.ac.id/id/eprint/1989

Actions (login required)

View Item View Item