Uji Turnitin: Grid Study of Mini Hydro Power Plant (MHPP) of Palangai Hulu 2x4,9 MW South Pesisir

Hidayat, Dayat and Arnita, Arnita and Cahayahati, Cahayahati and Saiful Jamaan, Saiful (2021) Uji Turnitin: Grid Study of Mini Hydro Power Plant (MHPP) of Palangai Hulu 2x4,9 MW South Pesisir. UNIVERSITAS BUNG HATTA.

[img] Text
Prosiding 2 ESTIC turnitin.pdf

Download (1MB)

Abstract

Tidak ada indikasi Plagiasi. Simlarity cukup besar karena Turnitin menguji diri sendiri

Item Type: Other
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknologi Industri > Teknik Rekayasa Komputer dan Jaringan
Depositing User: Hidayat UBH
Date Deposited: 30 Dec 2021 07:41
Last Modified: 30 Dec 2021 07:41
URI: http://repo.bunghatta.ac.id/id/eprint/7031

Actions (login required)

View Item View Item