Indra Khaidir, S.T,. M.Sc, Indra Khaidir and Zufrimar, S.T,.M.T, Zufrimar and Yodie Ikhwana, Yodie (2023) ANALISA PERCEPATAN WAKTU DAN PENGENDALIAN BIAYA PADA PROYEK PENYELESAIAN GEDUNG J KAMPUS III UIN IMAM BONJOLPADANG DENGAN METODE TIME COST TRADE OFF. Other thesis, Universitas Bung Hatta.
Text
TA YODIE BAB 1-5 .pdf Restricted to Repository staff only Download (2MB) |
|
Text
COVER.pdf Download (21kB) |
|
Text
daftar isi.pdf Download (38kB) |
|
Text
abstrak.pdf Download (11kB) |
|
Text
bab pendahuluan.pdf Download (24kB) |
|
Text
kesimpulan saran.pdf Download (40kB) |
|
Text
daftar pustaka.pdf Download (92kB) |
Abstract
During the implementation of construction projects, discrepancies often occur between the planned schedule and realization in the field, which can result in increased implementation time and cost overruns. This research aims to find out efforts to accelerate projects and find out the comparison of cost overruns after using the Time Cost Trade Off method with the help of Microsoft Project and Microsoft Excel. The results of the research obtained an acceleration of 56 days and the best alternative was obtained, namely by adding labor because the cost increase was IDR 103,726,535, less than the alternative of adding working hours where the cost increase was IDR. 980,502,162.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik Sipil dan Perencanaan > Teknik Sipil |
Depositing User: | Teknik Sipil FTSP |
Date Deposited: | 26 Sep 2023 07:48 |
Last Modified: | 26 Sep 2023 07:48 |
URI: | http://repo.bunghatta.ac.id/id/eprint/16597 |
Actions (login required)
View Item |